Cases
Space Bio Decontamination Service
Service Process
01. On-site Inspection
-

- Identify Issues for Maintaining Sterility
- · Identify contamination risks and sterility maintenance issues in the customer’s sterilized areas
-

- Inspection of HVAC and Facility Conditions
- · Check HVAC systems in sterilized areas
- · Inspect internal equipment and structures
-

- Cleanroom Material Compatibility Check
- · Inspect cleanroom panels
- · Check floor materials (e.g., epoxy)
- · Review production facilities and laboratory equipment
-

- Sterilization Service & GCD Contract
- · Gassing Cycle Development (GCD) validation
- · General space sterilization service
02. Sterilization Plan Development
-

- Preparation of Sterilization Service Plan
- · Develop a plan based on on-site conditions and contract requirements
-

- Review and Approval
- · Client review and approval
- · Submission of the plan
03. SBDS Execution and Completion
1. Equipment delivery (preparation area)
8. Equipment operation and installation of sterilization area signage
2. Equipment cleaning
9. Leak gas inspection
3. Equipment transfer (target sterilization area)
10. HVAC system operation
4. Equipment placement
11. Completion of sterilization
5. Placement of BI & CI
12. BI incubation
6. Leak test and sealing process
13. Preparation of service report
7. Indoor environmental condition check
14. Review, approval, and submission
On-site Photos